logo
* 搜尋
* 核能資訊中心
* 中心簡介
* 相關資訊
* 瀏覽人數
今天: 120
昨天: 123
本月: 2348
總計: 539836
國際核能現況 :  Belgian government approves funding for Myrrha
發表人 nicenter 於 2018/9/12 10:02:33 (14 人讀取)

Belgian government approves funding for Myrrha


Belgium's Council of Ministers has approved EUR558 million (USD646 million) in funding for the Myrrha accelerator-driven research reactor at the Belgian Nuclear Research Centre's (SCK-CEN's) site in Mol.




An artistic impression of how Myrrha may appear (Image: SCK-CEN)

SCK-CEN said the funding - approved at a meeting on 7 September - "will help carry out the first important part of Myrrha: building the first part of its particle accelerator and target facilities", known as the "Minerva" installation. The funding will be provided over the period 2019-2038, firstly to cover by 2026 both the investments of the Minerva installation, the studies and the development of the installation, and secondly the operating costs of the Minerva installation after 2027.


The government also approved the creation of an international non-profit-making body to be known as AISBL/IVZW Myrrha. This is a legal status adapted to large-scale projects financed by several foreign states.


"This decision will strengthen promotion and reception of foreign partners which are interested in the Myrrha project and its applications," SCK-CEN said.


Myrrha - Multipurpose Hybrid Research Reactor for High-tech Applications - will be a sub-critical assembly relying on accelerated protons producing neutrons in the target to achieve periods of criticality in a low-enriched uranium core. It will be a 57 MWt accelerator-driven system in which a proton accelerator will deliver a 600 MeV proton beam to a liquid lead-bismuth (Pb-Bi) spallation target that is in turn coupled to a Pb-Bi cooled subcritical fast nuclear core.


It is intended to replace Belgium's ageing BR2 research reactor, and will be used in a range of research functions including the demonstration of the concept of transmutation of long-lived radionuclides in nuclear waste, as well as producing radioisotopes for medicine. Myrrha will also be used for conducting fundamental scientific research in areas such as nuclear physics, atomic physics, fundamental interactions, solid-state physics and nuclear medicine.


"Thanks to its unique and innovative nature, the research infrastructure will attract researchers from all over the world to Belgium and will train a new generation of experts to provide technological solutions to these major challenges," said SCK-CEN Director-General Eris van Walle.


The project forms part of the European Strategy Forum on Research Infrastructures, and is one of three new research reactors forming the cornerstones of the European Research Area of Experimental Reactors, alongside the Jules Horowitz Reactor at Cadarache in France and the Pallas reactor at Petten in the Netherlands.


In 2010, the Belgian government gave the go-ahead for the construction of Myrrha. The country is to contribute 40% towards the EUR960 million investment the project will require. The Myrrha project is envisaged as a partnership of Belgium, the European Union, the European Investment Bank and other partners, with 70% of the funding from EU countries.


Hamid Aït Abderrahim, director of the Myrrha programme and deputy director general of SCK-CEN, said: "Thanks to our government's support, Myrrha has made great progress. I would like to thank everyone who assisted in obtaining this decision and who supported this project from the very beginning, in Belgium and abroad. The political, industrial and local authorities' support also contributed to this success and will remain crucial to complete the project."


Construction of the Myrrha reactor itself expected to begin in 2026, with full-operation from 2033.


Researched and written by World Nuclear News



source: http://www.world-nuclear-news.org/Articles/Belgian-government-approves-funding-for-Myrrha



其他新聞
2018/9/19 9:50:17 - Centrus and Doosan sign advanced reactor MoU
2018/9/19 9:48:52 - French EPR engineering simulator to be upgraded
2018/9/19 9:47:20 - IAEA highlights nuclear's role in combating climate change
2018/9/19 9:45:28 - Challenging the nuclear finance status quo
2018/9/19 9:42:52 - Hualong One simulator ready for operator training
2018/9/17 9:35:44 - UK and USA enhance nuclear research cooperation
2018/9/17 9:33:05 - UK collaboration for safety and security research
2018/9/17 9:31:22 - Nuclear industry faces wake-up call, says IAEA's Chudakov
2018/9/17 9:26:43 - US plant operators prepare for Hurricane Florence
2018/9/14 9:39:51 - Newcomer countries need 'collaborative approach'
2018/9/14 9:36:42 - Investment needed to maintain nuclear's growth, says IAEA
2018/9/14 9:34:49 - Climate targets need market reform, says NEA's Magwood
2018/9/14 9:27:18 - India recommissions Apsara research reactor
2018/9/14 9:25:19 - California to be carbon neutral by 2045
2018/9/14 9:22:17 - 輻射監測更上層樓,蘭嶼氣象站標準型環境輻射監測設施啟用
2018/9/12 10:06:26 - Help the public understand radiation, advises cancer expert
2018/9/12 10:02:33 - Belgian government approves funding for Myrrha
2018/9/12 10:00:34 - IAEA completes Sudan nuclear infrastructure review
2018/9/12 9:58:46 - California to be carbon neutral by 2045
2018/9/12 9:49:01 - 原能會讓國人「石」在安心-持續執行107年石材建材業者輻射檢測

 線上期刊目錄

 友善連結

單位類

行政院原子能委員會
放射性物料管理局
核能研究所
國立清華大學工程與系統科學系
國立清華大學生醫工程與環境科學系
中華民國核能學會
財團法人核能科技協進會

新聞類


30013 新竹市光復路二段101號 創新育成中心三樓309室 電話:(03)571-1808 傳真:(03)572-5461 Email: nicenter@nicenter.org.tw