logo
* 搜尋
* 核能資訊中心
* 中心簡介
* 日本福島核災專區
* 相關資訊
國際核能現況 : India plans tenfold uranium output growth
發表人 nicenter 於 2018/3/9 14:10:45 (76 人讀取)

India is planning a tenfold increase in uranium production over the next 15 years, Minister of State Jitendra Singh told the country's parliament yesterday. State company Uranium Corporation of India Ltd (UCIL) has outlined expansion plans to meet the Department of Atomic Energy's (DAE) vision of achieving self-sufficiency in uranium production.




In answer to questions in the Lok Sabha, Singh said UCIL, which is a public service undertaking with the DAE, has outlined a plan for "massive expansion" leading to a tenfold rise in uranium production by 2031-2032. The plan includes maintenance of sustained supply from existing facilities, capacity expansion of some existing units and construction of new production centres (mines and plants) in different parts of the country, he said.


"Considering the resources already identified in different geological basins by Atomic Minerals Directorate for Exploration and Research (AMD), a constituent unit of DAE, UCIL's major production centres are planned in Jharkhand, Andhra Pradesh, Karnataka, Telangana, Rajasthan and Meghalaya," Singh said.


The expansion is planned in three phases, with the first expected to increase uranium production to 3.5 times existing levels by the "12th year". Completion of projects in the second phase is expected to achieve a sevenfold expansion over current production, with the third phase of projects leading to a tenfold increase over current levels by 2031-32.


According to the 2016 edition of the OECD Nuclear Energy Agency and International Atomic Energy Agency joint report on uranium resources, production and demand (the 'Red Book'), India's known conventional uranium resources - reasonably assured resources and inferred - were estimated to be 181 606 tU as of January 2015. Uranium mills currently operate at Jadugudah and Turamdih, both in Jharkand, and Tummalapalle in Andhra Pradesh. India produced 385 tU in 2015. The AMD claimed to have established domestic uranium resources of 232,315 tU as of November last year.


India operates 22 nuclear reactors, eight of which are fuelled by indigenous uranium. Fourteen reactors are under international safeguards and use imported uranium. Six units - four indigenously designed pressurised heavy water reactors, a fast breeder reactor and a Russian-designed pressurised water reactor - are currently under construction. Construction is planned to begin on 19 further units within the next few years, including ten indigenously designed PHWRs which are scheduled to start up by 2031. Agreements envisage the import of uranium up to 2020, Singh said.

Researched and written
by World Nuclear News



source:http://www.world-nuclear-news.org/UF-India-plans-tenfold-uranium-output-growth-0803187.html



其他新聞
2018/6/15 15:27:03 - 端午連假豪雨報到 台電成立緊急應變中心待命
2018/6/15 15:14:42 - Nuclear Body Sounds Warning On Premature Shutdowns In France And Calls For ‘Renewal’ Of Nuclear Fleet
2018/6/15 15:13:41 - First yellowcake from seawater for US team
2018/6/15 15:11:29 - Start-up of Finnish EPR put back four months
2018/6/13 15:12:06 - 新機組陸續上線 台電:明年起備用維持15%以上 穩定供電無虞
2018/6/13 15:09:41 - 以最高標準要求安全,核二廠2號機因高壓輸電線路夾板溫度偏高之非機組因素,預定今(12)日晚上解聯調整
2018/6/13 15:04:17 - Jordan Abandons Nuclear Station Deal With Russia
2018/6/13 15:02:06 - Cooperation strengthens mining radiation protection
2018/6/13 14:58:59 - IAEA launches challenge on materials for fusion
2018/6/6 14:39:25 - 竹園超高壓變電所正式啟用 再提升竹科及新竹地區供電品質
2018/6/6 14:28:38 - 原能會今(5)日同意台電公司核二廠2號機急停後再起動
2018/6/6 14:27:30 - DOE announces funding for innovative nuclear technology
2018/6/6 14:25:29 - Tepco frees up Fukushima Daiichi fuel storage space
2018/6/6 14:24:23 - UK starts talks on public investment in nuclear power
2018/6/1 14:22:44 - 針對媒體評論「備轉容量率3%多是『電力供應充足』!」的回應說明
2018/6/1 14:20:00 - 「低放射性廢棄物貯存設施再評估報告審查導則草案」徵詢各界意見
2018/6/1 14:19:06 - Kansai cuts power rates as reactors restart
2018/6/1 14:16:45 - Toshiba scraps project to build ABWRs in Texas
2018/6/1 14:14:33 - US energy regulators back Illinois legislation
2018/5/30 14:20:00 - Barakah 1 start-up schedule revised for operator training

 線上期刊目錄

 瀏覽人數
今天: 33
昨天: 183
本月: 2905
總計: 526321

30013 新竹市光復路二段101號 創新育成中心三樓309室 電話:(03)571-1808 傳真:(03)572-5461 Email: nicenter@nicenter.org.tw