logo
* 搜尋
* 核能資訊中心
* 中心簡介
* 日本福島核災專區
* 相關資訊
國際核能現況 : Belgium’s Regulator Approves Tihange-1 Restart
發表人 nicenter 於 2017/5/17 9:55:46 (130 人讀取)

Belgium’s Regulator Approves Tihange-1 Restart



16 May (NucNet): Belgium’s Federal Agency for Nuclear Control (Fanc) has approved the restart of the Tihange-1 nuclear reactor unit, which has been offline since 7 September 2016 following damage to a non-nuclear building during upgrade work. Fanc said on 15 May 2017 that operator Engie Electrabel had shown all necessary work for the safe operation of the plant had been carried out. FANC said upgrade work that led to the damage was being done as part of a life extension of the unit to 1 October 2025. During the upgrade work, the building equipped with auxiliary components was damaged, causing the reactor to trip. The pumps in the auxiliary building must be continuously available, Fanc said. Tihange-1, a 962-MW pressurised water reactor unit, began commercial operation on 1 October 1975.



source: http://www.nucnet.org/all-the-news/2017/05/16/belgium-s-regulator-approves-tihange-1-restart



其他新聞
2018/4/25 14:18:47 - 經濟部、台電昨開深澳電廠記者會 宣示打造世界高效低排電廠 不讓供電與環保成為選擇題
2018/4/25 14:13:20 - Bruce Power signs advanced manufacturing contracts
2018/4/25 14:11:19 - Macron: Europe must prioritise emission reductions
2018/4/25 14:09:36 - State Backing Means China Can Absorb Risks Of New Nuclear, Says Report
2018/4/20 14:20:00 - 台電回應綠色和平,深澳對pm2.5的貢獻度最多0.08~0.18%,不知「相當於160萬輛汽車」的推估是從何而來?
2018/4/20 14:11:05 - 大潭電廠新增機組輸電線路變更 降低環境衝擊 依法提出環差申請
2018/4/20 14:07:49 - IAEA tests drone to fight disease-carrying mosquitos
2018/4/20 14:05:39 - Canada considers participation in Iter fusion project
2018/4/18 15:20:00 - 還原瑞芳保育區爭議的真相,台電籲請外界回歸事實討論
2018/4/18 15:18:00 - 台電深澳超超臨界計畫空品影響不到法規萬分之一 不會有許厝國小第2
2018/4/18 15:13:38 - AEM Technology sees milestone with first VVER-TOI
2018/4/18 15:10:12 - Report highlights impact of US nuclear plant closures
2018/4/18 15:04:37 - India, USA to collaborate on neutrino science
2018/4/11 15:10:00 - 台電簽署離岸風電第三方驗證合作備忘錄 為健全綠色金融環境助力
2018/4/11 15:08:23 - 原能會已設立「核二廠2號機再起動」專區,持續公開管制資訊
2018/4/11 15:03:05 - Council formed to support Canadian isotope production
2018/4/11 14:56:44 - Final Barakah dome complete
2018/3/30 14:47:16 - 今(29)日8時17分南投地區規模4.8有感地震,各核能電廠皆正常運作,原能會持續監控電廠運轉安全
2018/3/30 14:46:01 - 地熱發電國家隊首部曲 台電與中油簽MOU開發宜蘭地熱
2018/3/30 14:26:54 - FirstEnergy gives notice to deactivate four units

 線上期刊目錄

 瀏覽人數
今天: 89
昨天: 71
本月: 2435
總計: 519805

30013 新竹市光復路二段101號 創新育成中心三樓309室 電話:(03)571-1808 傳真:(03)572-5461 Email: nicenter@nicenter.org.tw